Reply To: File Management in Studio Projects

  • Vince

    Member
    October 5, 2023 at 12:23 am
    Points: 16,890
    Rank: UC2 Brainery Advanced Blue Belt I UC2 Brainery Advanced Blue Belt I

    Thanks @Doug!

    I wasn’t sure if I was needing to look at sets or if there was some other way of inserting new and / or updated drawings into a Project? I know I’ve already bored everyone about this but, due to how inconsistent our designers are with how they name drawings, sets are extremely difficult to use here in the UK.

    I thought slip sheeting was going to be the answer but that doesn’t necessarily seem to be the case.

    I was looking at Projects and possibly a Dashboard but it’s essential that I can easily import new information.